CHANGE LOG - ARTC DIN Corridor (South Australia - Western Australia)
Changes since 1 July 2009 -- Most recent on top
Change date Drawing Location Details
3 Apr 2017 All SA Changed yard switchstand icons
6 Sep 2016 S077 Snowtown Added shunt spur at Viterra load out    
6 Sep 2016 S076 Bownans Added run around loop at Bowmans Rail siding
31 Aug 2016 S102 Mile End Signals at north end now approach lit    
5 Aug 2016 S102 Mile End Signals 4& 4E moved to 3.737
8 Jul 2016 S815 Ooldea Position of Enhancer Repeater corrected    
20 May 2016 S102 Mile End Loop lengthened - South end
25 Feb 2016 S401 Peterborough Corrected position of end of loop    
10 Feb 2016 S103 Belair Sig 3 now LED
18 Dec 2015 W831 Forrest Cripple Siding o.o.s    
7 Oct 2015 S110 Kumorna Signals 220 & 221 now LED
24 Sep 2015 S081 Pt Germein New SCT siding commissioned    
6 Sep 2015 S004r APT New drawing
4 Sep 2015 S100 AFT New Drawing    
4 Sep 2015 S070>S089 ADE-PTAA Update of all drawings of Port Augusta Line
26 Aug 2015 S100 AFT New drawing (ex A042)    
26 Aug 2015 S070 Dry Creek Triangle Drawing re-structured
5 Aug 2015 S071 Dry Creek Junction Signal 14 now LED    
20 Jul 2015 W840 Golden Ridge New Active RLX
27 Jun 2015 S801 Tent Hill Engineers siding commissioned    
6 Jun 2015 S804 Burando Removal of camp siding
3 Jun 2015 S073 SCT Penfield Converted to an indivdual yard drawing    
27 May 2015 Most All lines Added 2500k advance warning of signals
6 May 2015 S065 Port Flat Bg access to roads 5 & 6 disconnected    
4 May 2015 S401 Gladstone Added signage to Main Rd LX
28 Apr 2015 S076 Bowmans Signals 23 & 23E now LED    
15 Mar 2015 S801 Tent Hill New turnout 11 installed in Loop
13 Jan 2015 S078 Red Hill - Rocky River Signals 174, 182, 183, 191 now LED    
20 Nov 2014 S076 Bowmans Signals 4 & 4E now LED
20 Nov 2014 S102 APT Signal 2 now LED    
15 Nov 2014 S102 Mile End Loop Signals 4 & 4E now LED
15 Nov 2014 S61-70 Pelican Point Line Removed broad gauge operations (diamond X/O at Dry Creek)  
7 Nov 2014 S112 Wolseley Signals 305 & 310 changed to LED abd 'B' arm added
1 Nov 2014 S076 Bowmans Signals 987 & 104 changed to LED abd 'B' arm added    
15 Oct 2014 S805 Kingoonya Addded missing point designations
13 Oct 2014 S074-5 Bolivar-Two Wells Drawings re-arranged    
13 Oct 2014 S073 SCT Penfield New Drawing
13 Oct 2014 S070-S072 Dry Creek New Drawing numbers (were S071-S073)    
3 Oct 2014 S076 Bowmans Signals 987 & 104 now LED
22 Aug 2014 S102 Goodwood Leader St Xing - Now 'Caution another train coming'    
6 Aug 2014 S1085 Roopena Lengthened with motorised points and target enhancers
13 Jun 2014 S806/807 Ferguson/Tarcoola CTC commissioning (new drawings)    
4 May 2014 S1085 Roopena Loop o.o.s - pending extesion
20 Mar 2014 S086/805 Kultanaby/Kingoonya CTC commissioning    
9 Jan 2014 S801-804 McLeay - Wirriminna Changes to Siding operation & locking
14 Nov 2013 S801-04 McLeay - Wirriminna CTC commissioning    
12 Nov 2013 S1087 Whyalla Ore Unloader Geographical changes
9 Nov 2013 S102 Mile End Sig 1 moved to down side of new ped. Bridge (visibility)  
5 Oct 2013 S102 Mile End Sig 209 removed, Sig 44 moved to non-preferred side
3 Oct 2013 S072/3 & 101 Various Added extra page linking    
26 Sep 2013 S081 & S810 Various Corrected aspects on Departure Signals
20 Sep 2013 S801 & S085 Hesso & Bookaloo Extension of CTC    
12 Sep 2013 S076 & 78 Natanwarra + Redhill Grain sidings o.o.s
8 Sep 2013 S076 Nantawarra Corrected configuration of RLX772    
28 Aug 2013 S801 Tent Hill new drawing with CTC
28 Aug 2013 S085 Tent Hill Removed Tent Hill    
28 Aug 2013 S084 Spencer Junction Changes to Tarcoola line exit
28 Aug 2013 S061 Bishop Added Superway    
28 Aug 2013 S106 Callington Corrected form of signal 24
28 Aug 2013 S102 Mitcham Added Missing signals number NR8    
28 Aug 2013 S101 Kilburn Added grade crossing slot
30 Jun 2013 S106 Callington Corrected RLX nr Callington    
29 Jun 2013 S107 Murray Bridge RLX at Cypress Tce now Predictor
27 Jun 2013 S107 Monarto Sth - Murray Bdge Signal Chances to 84,88, 89, 93 and Predictor @ RLX0048  
26 Jun 2013 S102 Goodwood Signalling and Notice Board changed
20 Jun 2013 S081 Port Germein - Winninowie Corrections following CTC commissioning    
20 Jun 2013 S105 Mt Barker Junction New RLX0573 @ 51.893
20 Jun 2013 S106 Callington New RLX0078 @ 68.020    
3 Jun 2013 S081/2 Winninowie/Stirling Nth CTC commissioning
22 May 2013 S108 Cookes Plains Spelling    
4 May 2013 S081 Mambray Creek CTC commissioning
20 Apr 2013 S080/1 Coonamia - Port Germein Drawing modifications    
10 Apr 2013 S087 Tarcoola West access to sidings altered
10 Apr 2013 S102 Goodwood Grade Crossing Removed    
6 Apr 2013 S080/1 Coonamia - Port Germein Commissioning of CTC
6 Apr 2013 S079 Crystal Brook Signals 117 118 are absolute    
27 Mar 2013 S081 Port Germein Up end of siding removed
21 Feb 2012 S402 Peterborough New sign at Silver St RLX    
1 Feb 2013 S1085-1089 Whyalla Environs Updated drawings
7 Dec 2012 S075/6 Mallala - Long Plains Conversion of signals to LED    
11 Nov 2012 S104/5 Ambleside - Balhannah Commissioning of Ambleside
25 Oct 2012 S101-02 Adelaide Added approach markers to Signal 22    
18 Oct 2012 S1086-1087 Whyalla New drawings - Arrium works area
27 Sep 2012 S104 Mt Lofty - Balhannah section Signal changes    
27 Sep 2012 S080 Coonamia RLX 579 changed from manual to Axle Counter operation
22 Sep 2012 S064 Pelican Point Altered weighbridge signal    
5 Sep 2012 S1085 Spencer Jcn - Whyalla Replaced drg S097
9 Aug 2012 S403 Hillgrange - Mannahill Signalling changes    
9 Aug 2012 S106 Callington Ballast siding amended
10 Jul 2012 S401 Gladstone Added controlled RLX 838    
23 Jun 2012 S102-112 South Line Minor updates
16 Jun 2012 S080 Coonamia Signals 13, 13E & 14 now LED. Wauchopes Rd RLX now active  
25 May 2012 S106 Petwood Signal 607 replaced by 587 (LED)
16 May 2012 S109 Ki Ki Signals 167 & 168 now LED    
10 May 2012 S112 Wolseley New RLX 49 @ 301.370
9 May 2012 S106 Nairne RLX @ Woodside RD now Predictor    
2 May 2012 S079 Crystal Brook New mainline TO installed
23 Apr 2012 S081 Pt Germein-Winninowie Added ATMS trial    
30 Mar 2012 S073 Two Wells Signals 4, 4E, 429 & 480 now LED
28 Feb 23012 S404 Olary-Mingary Signalling changes    
28 Feb 2012 S403 Mannahill Signalling changes
9 Feb 2012 S404 Mingary - Thackaringa Conversion of signals to LED    
7 Feb 2012 W092 Rawlinna Siding at triangle apex removed
29 Jan 2012 S106 Nairne Princes Hwy RLX now predictor    
20 Dec 2011 S106 Nairne Jeffrey St RLX now predictor
14 Dec 2011 S074 Bolivar SCT siding development    
14 Dec 2011 S075 Two Wells Sheet rearrangement
21 Nov 2011 S104 Ambleside New loop under construction    
21 Nov 2011 S105 Ambleside New loop under construction
16 Nov 2011 S080 Coonamia Signal changes corrected
16 Nov 2011 S079 Crystal Brook Signal changes corrected    
3 Nov 2011 S080 Coonamia Signals 354 & 355 are now LED
3 Nov 2011 S079 Crystal Brook Signals 336, 337, 344 & 345 now 182, 181, 116 & 117 and are now LED
21 Oct 2011 S079 Crystal Brook Signal 5 now LED, Signal 331 now 265 and LED, LX Weston Rd now Predictor
21 Oct 2011 S401 Gladstone Signals 2 & 4 now LED    
27 Sep 2011 S401 Gladstone/Caltowie Signals GD 1,3 CT 2,4 now LED
18 Sep 2011 S074 Bolivar Further developments of SCT siding    
18 Sep 2011 S402 Peterborough Romoval of Temp RLX @ Dowds Hill
31 Aug 2011 S061 Bishop Additional Road Traffic Signals @ Hanson Rd RLX    
20 Aug 2011 S111 Bordertown Down end loop connected
18 Aug 2011 S404 Broken Hill Line RLX km adjusted    
18 Aug 2011 S403 Broken Hill Line RLX km adjusted
18 Aug 2011 S402 Jamestown Signal changes & RLX km adjusted    
18 Aug 2011 S410 Caltowie Signal changes & RLX km adjusted
29 Jul 2011 S106 Callington Ballast Siding commissioned    
22 Jul 2011 S111 Bordertown Commissioned Signal 1
21 Jun 2011 S080 Coonamia Signal 3,4, & 4E now LED    
11 Jun 2011 S076 Avon RLX 0751 now active
11 Jun 2011 S075 Mallala Added active RLX 0018    
4 Jun 2011 S075 Two Wells Elizabeth St RLX predictor
4 Jun 2011 S074 Bolivar Commissioned Up end access to SVT siding    
21 May 2011 N405 Kanandah Commissioning of Perilya sdg.
29 Apr 2011 S402 Yongala-Peterborough Signalling changes    
28 Apr 2011 S106 Callington Commissioned new loop
11 Apr 2011 S075 Mallala Hill Rd LX solar    
20 Mar 2011 S111 Bordertown Part Commissioning of new extended loop
1 Mar 2011 S402 Peterborough Signalling changes    
1 Mar 2011 S403 Hillgrange Signalling changes
10 Feb 2011 S107 Monteith New loop commissioned    
10 Feb 2011 S108 Tailem Bend Signal 115 now LED
28 Jan 2011 S074 Virginia Penfield & Gawler Rds RLX now predictor    
27 Jan 2011 S107 Monteith Loop construction progress
27 Jan 2011 S106 Callington Loop construction progress    
25 Jan 2011 S074 Bolivar SCT Siding connected
17 Jan 2011 S110 Coombe Goods Siding o.o.s    
17 Jan 2011 S105 Balhannah Goods Siding o.o.s
17 Jan 2011 S077 Snowtown Goods Siding o.o.s    
17 Jan 2011 S075 Two Wells Goods Siding o.o.s
13 Jan 2011 S110 Keith Further commisioning details    
9 Nov 2010 S110 Keith Extended loop commissioned
30 Oct 2010 S111 Brimbago Changed signal designations    
10 Oct 2010 S110 Tintinara Extenxded Loop commissioned
25 Sep 2010 S107 Monteith New TO #12 Installed    
24 Aug 2010 S403 Hillgrange Extended loop length
3 Aug 2010 S107 Monteith New #7 TO Installed    
3 Aug 2010 S071 Dry Creek Added TA slots
7 Jul 2010 S110 Tintinara Signals 4 & 5 now LED    
4 Jul 2010 W094 Curtin New Engineers siding
4 Jul 2010 S086 Coondambo Final configuration of new loop    
1 Jul 2010 S075 Mallala Boom gates fitted to RLX 0071
1 Jul 2010 S076 Avon New active RLX 0752    
1 Jul 2010 S078 Merriton New active RLX 0069
1 Jul 2010 S086 Coondambo New loop commissioned    
1 Jul 2010 S111 Wirrega New active RLX 1041
1 Jul 2010 S404 Cultana RLX938 now predictor opn & advance warning signs    
17 Jun 2010 S075 Mallala Dublin Rd RLX is Predictor    
17 Ju 2010 S080 Coonamia New Actice LX @ Pirie Blocks Rd    
6 Jun 2010 S085 Hesso RLX 639 is predictor
6 Jun 2010 S107 Monarto South RLX 993is predictor    
6 Jun 2010 S111 Cannawigara RLX 1042 is predictor
6 Jun 2010 S402 Peterborough RLX 894 is predictor    
5 Jun 2010 S076 Long Plains New Active RLX - RLX750
5 Jun 2010 S097 Lincoln Gap New loop proposed    
5 Jun 2010 S107 Swanport Added missing signals 103 + 104
23 May 2010 S104 Ambleside Drawing expanded    
23 May 2010 S105 Balhannah Drawing re-configured (was part 104-105)
23 May 2010 S106 Petwood - Callington Renumbered - was 105    
23 May 2010 S107 Monarto Sth - Murray Bdg Renumbered - was 106
23 May 2010 S108 Tailem Bend Renumbered - was 107    
23 May 2010 S109 Coomandook - Coonalpyn Renumbered - was 108
23 May 2010 S110 Tintinara - Keith Renumbered - was 108-109    
23 May 2010 S111 Wirrrega - Bordertown Renumbered - was 109-110
23 May 2010 S112 Wolseley Renumbered - was 110    
21 Apr 2010 S074 Bolivar Loop extended
21 Apr 2010 S075 Two Wells Additional active RLX's    
21 Apr 2010 S086 Coondambo (new site) New Loop
21 Apr 2010 S089 Thomiar New Loop    
21 Apr 2010 S402 Yongala New active RLX @ 73.460    
14 Apr 2010 S402 Yongala New active RLX @ 91.2    
14 Apr 2010 S105 Petwood New active RLX @ 63.5
12 Apr 2010 S405 Kandandah Removed surplus track    
12 Apr 2010 S402 Yongala Removed surplus track
12 Apr 2010 S108 Coomandook New loop length    
9 Apr 2010 S405 Kanandah Down approach now at 3000m
24 Feb 2010 S062 Gillman Sig 34 now LED    
21 Feb 2010 S093 Goddards Additional details - new loop
17 Feb 2010 S075 Mallala Sig 618 now LED    
3 Feb 2010 S093 Goddards & Chifley New passing loops
3 Feb 2010 S403 Yunta Centre loop X/O removed    
29 Jan 2010 S107 Tailem Bend Added RLX 1001 & 0081
29 Jan 2010 S108 Coomandook Loop extension and RLX1010    
29 Jan 2010 S109 Keith Minor changes
29 Jan 2010 S110 Bordertown Minor changes    
15 Jan 2010 S103 Belair Up end signals now normally black.
16 Dec 2009 S076 Long Plains/Bumbunga Active crossings commissioned @ RLX043 & 778    
16 Dec 2009 S074 Virginia/Two Wells Boom gates added to RLX 722, 723 & 724    
14 Dec 2009 S086 Coondambo Corrected place name    
9 Dec 2009 S075 Mallala Signal 613 now LED
9 Dec 2009 S091 Mundrabilla Typo corrected    
9 Dec 2009 S092 Wilban Typo corrected    
9 Dec 2009 S093 Karonie Typo corrected    
16 Sep 2009 S107 Tailem Bend RLX104 protection and sig 122 changed
18 Jul 2009 S106 Swanport Proposed new loop renamed
18 Jul 2009 S110 Tatiara Proposed new loop added    
18 Jul 2009 S074 Direk Proposed new loop reconfigured
18 Jul 2009 S402 Jamestown Proposed loop extension added    
15 Jul 2009 S082 Stirling North Signal 14E now LED
10 Jul 2009 S076 Avon Corrected signal numbers 895 & 987.    
10 Jul 2009 S076 Nantawarra Up departure signals 4 & 4E now LED