CHANGE LOG - ARTC Hunter Valley Lease (NSW)
Changes since 1 August 2009 - Most recent on top
Change date Drawing Location Details
6 Feb 2017 N502 Kooragang Is Xover 141 removed    
6 Feb 2017 N595 Narrabri Fitzroy Rd RLX now Axle Counter
30 Jan 2017 N588/9 Gunnedah Added 'residential area' notices    
4 Dec 2016 N596/7 Penneys Rd & Moree Changes to ownership of siding facilities
17 Nov 2016 N537-8 Kooragang Island Commissioning of Holding Roads A&B    
16 Nov 2016 N502 Hanbury Junction Corrected signal designations
1 Oct 2016 N554-560 Murrurundi - Werris Creek Detail updates    
30 Sep 2016 N572-N578 Ulan Line Loop lengths updated
25 Sep 2016 N586 Nea Location deledted    
17 Jun 2016 N592-598 North Star Line Board measurements added
31 May 2016 N572 Mangoola Active RLX 613 commissioned    
27 May 2016 N502 Kooragang Junction NFU4 corrected label
17 May 2016 N587 Curlewis G Frame moved    
17 Feb 2016 N559 Quirindi Grain Silo Warning boards removed
13 Feb 2016 N596 Gurley Changed configuration of Up End points    
7 Feb 2016 N569 Werris Creek Bulk Wheat Added details
22 Jan 2016 N500 - N553 Islington - Scone Major review and update    
15 Jan 2016 N597 Moree Added loading facilities
15 Jan 2016 N596 Ballata Moved from 595    
15 Jan 2016 N595 Narrabri L/D Siding Redrawn
18 Dec 2015 N590 Maules Creek Branch BC9 location rectified    
18 Dec 2015 N595 Edgeroi Lay of Main Line Points reversed
14 Dec 2015 N535 Carrington Added newcastle Agri Terminal    
6 Nov 2015 N557 Kankool Completion of loop extension
6 Nov 2015 N513 Singleton Single numbering changes    
6 Nov 2015 N512 Belford Added dragging detectors
14 Aug 2015 N554 Murulla Signal changes to allow 50kH Loop entry    
23 Jul 2015 N591 Boggabri Re-instated missing RLX @ Boston St
17 Jul 2015 N509/11/12 Various Minor geographical changes    
12 Jul 2015 N552/3 Togar Signalling changes
8 Jul 2015 N504 Hexham LTTSF Final commissioning details    
24 Jun 2015 N575 Cox Creek Tunnels Distances altered
24 Jun 2015 N574 Baerami BI3 signal re-positioned on non-preferred side    
12 Jun 2015 N578 Ulan Coal Loop Signals 436.6 & 436.9 removed
12 Jun 2015 N588 Gunnedah Changes to shunt signals 8 & 11    
12 Jun 2015 N597 Moree South New Active RLX at Tapscott Rd (658.027)
14 May 2015 N537,539 Kooragang Is NGIC access overpass commissioned    
14 May 2015 N538 Kooragang Is Removed weighbridge
3 May 2015 N588 Gunnedah Altered label of signal GH2    
1 May 2015 N511 Branxton Frame B removed
24 Apr 2015 N507 Maitland Added Flood gates    
24 Mar 2015 N522 Greta TSF Added ID of RLX
24 Mar 2015 N520 Hehham Relief Added ID of RLX    
15 Mar 2015 N527 Denman New active RLX at 310.639
12 Mar 2015 N590/1 Maules Creek Branch Complete commissioning    
28 Feb 2015 N5597/8 Moree Implementation of PTOS (Electronic) Train Order Working
6 Feb 2015 N557 Ardglen Revised signal head depictions    
4 Feb 2015 N553 Scone Revised signal head depictions
2 Feb 2015 N535 Bullock Island Rearranged trackwork as installed    
23 Jan 2015 N590 Maules Creek Branch New drawing
15 Jan 2015 N591 Boggabri Coal Maules Creek T/O in 'pre-commissioned' use, and other minor changes  
15 Jan 2015 N558 Chilcotts Creek Point labels changed/added
15 Jan 2015 N592 Narrabri Coal Minor signal display changes    
15 Jan 2015 N575 Cox's Creek Minor signal display changes
15 Nov 2014 N588/9 Gunnedah Upgraded yard signalling    
5 Nov 2014 N504/520 Hexham New Up refuge Loops
31 Oct 2014 N539 NGIC New gantry with sigs NG55,57,59    
29 Oct 2014 N591 Boggabri Coal Added turn out for Maules Creek Project
16 Oct 2014 N592 Turrawan Changed signal aspects    
16 Oct 2014 N591 Boggabri Added Cox's Creek etc
16 Oct 2014 N588 Gunnedah Added up SL    
16 Oct 2014 N585 Breeza Corrected RLX at 431.730    
16 Oct 2014 N585 Gap Re-positioned MLI X and signal 15-64    
26 Sep 2014 N559 & N586 Bells Gate & Watermark Corrected signal locations re Simultaneous entry
26 Sep 2014 N587, 8 & 9 Breeza -- Emerald Corrected junction signals BOL direction    
15 Sep 2014 N539 NCIG Unloader New sheet & changes to departure tracks
15 Sep 2014 N537 South Arm (NCIG) Junction Split into 2 sheets (see also N539)    
15 Sep 2014 N538 Kooragang Island New signalling on Arrival roads
15 Sep 2014 N504 Hexham Single changes preparatory to new Hexham Relief    
13 Sep 2014 N537 Kooragang Island Shunt Limit Boards removed
13 Sep 2014 N566-9 Werris Creek Reverted Siganl prefixes to 15-    
13 Sep 2014 N523 Scone Added Emergency Xings
13 Sep 2014 N522 Aberdeen Removed Silo Road    
30 Aug 2014 N501 Waratah Changes to signals 20, 22 & 26
27 Aug 2014 N574 Kerrabee KE10 Distant moved to non-preferred side    
17 Aug 2014 N575 Bylong Corrected Signal prefixes
8 Aug 2014 N591 Boggabri Removed Boggabri Wheat location & Bobbabri silo road    
8 Aug 2014 N502/3 Sandgate Minor signal display changes
24 Jul 2014 N506 East Maitland Added missing station    
20 Jun 2014 N517/9 Drayton Jcn New Drayton Relief Road (an new drawing N518)
18 Jun 2014 N571 Bengalla Corrected configuration of MK171     
12 Jun 2014 N553 Scone Reconfiguration complete
21 May 2014 N597 Moree Active Xing protection added to level crossing @ 659.800    
28 Apr 2014 N553 Scone Reconfigured "country" end of loop
28 Apr 2014 N501>504 Islington Jcn >>>> Page numbering altered ..  501>500, 502>501, 503part>502    
28 Apr 2014 N509 Maitland $20B converted to Sping Wing Crossing point
12 Mar 2014 N537 NGIC Uncommissioned crossovers added    
31 Jan 2014 N507 Maitland Added missing catchpoint 406B
26 Nov 2013 N578 Ulan Modified 07-14    
12 Nov 2013 N538 Kooragang Island Rearranged points 119 & 120
1 Nov 2013 N510 Allendale EPO applied to signals 77, 79, 84 & 86     
28 Oct 2013 N569 & 591 Werris Ck & Boggabri Coal Corrected distances
28 Oct 2013 N558 Braefield Corrected signal designations    
16 Aug 2013 N566 Werris Creek Signal WC (15) 34 was missing
2 Aug 2013 N538 Kooragang Island Xover 118 reversed direction    
11 Jun 2013 N515 Ravensworth Junction Changed Signal NJ4
22 May 2013 N531 Port Waratah Change of YL signs with changes to NC boundaries    
22 May 2013 N502-4 Islington - Thorngate Change of YL signs with changes to NC boundaries
18 May 2013 N531,537 Port Waratah & Sandgate Change of YL signs with changes to NC boundaries    
18 May 2013 N502-4 Islington - Thorngate Change of YL signs with changes to NC boundaries
11 May 2013 N525 Ravensworth Branch Signals re-arranged    
11 May 2013 N517 Drayton Junction Points upgraded
11 May 2013 N515 Newdell Junction New Ravensworth Branch connection    
11 May 2013 N538 Kooragang New entry sign
8 May 2013 N535 Port Waratah New X overs - Grain Arrival roads    
5 May 2013 N596 Gurley Removed Catchpoint 3E
5 May 2013 N586 Watermark Commissioning of new Loop    
5 May 2013 N573 Yarrawa Corrected signal YA10
5 Apr 2013 N558 Braefield Corrected Signal no 12-12L    
27 Mar 2013 N591 Boggabri Loop now 1382m.
7 Mar 2013 N519 Muswellbrook Added MK166 Distant    
7 Mar 2013 N513/4 Camberwell Update the Nundah 3rd line commissioning
7 Mar 2013 N509/10/11 Maitland - Greta Signal number correstions    
4 Mar 2013 N515 Ravensworth Junction New Junction commissioned
1 Mar 2013 N517 Drayton Junction Junction development and signal changes    
22 Feb 2013 N575 Bylong Commissioned Loop extension
18 Feb 2013 N523 Integra Coal CL9 and sign added    
12 Feb 2013 N513 Singleton Signal corrections each end of yard
8 Feb 2013 N542 Bulga Junction Signal numbres corrected    
15 Jan 2013 N554/5/7 PagesCreek et.al Signalling format corrections
14 Dec 2012 N502/503 Hanbury Signalling corrections    
7 Dec 2012 N557/558 Chilcotts Creek  Loop commissioned
7 Dec 2012 N538 Kooragang Island No. 4 Discharge commissioned    
22 Nov 2012 N511 Greta-Branxton Commissioning of Grerta TSF
22 Nov 2012 N522 Greta TSF New drawing    
17 Nov 2012 N537/8 Kooragang Island Further devlopment of Dump station 4
15 Nov 2012 N515 Newdell Jcn New X over installed    
11 Nov 2012 N509/10 Maitland - Branxton Commissioning of Relief track (N509 - new drawing)
26 Oct 2012 N577 Wilpingjog RLX no longer predictor. Roads across loop removed    
18 Oct 2012 N574 Kerrebee Maintenance siding added
18 Oct 2012 N511 Branxton Siding extended    
26 Sep 2012 N577 Wilpinjong Loop Signal numbers corrected
26 Sep 2012 N576 Coggan Creek Distance changed    
26 Sep 2012 N573 Yarrawa Minor changes
26 Sep 2012 N558 Willow Tree Dn Dep signal numbers corrected    
26 Sep 2012 N557 Agdglen Road name changed
26 Sep 2012 N554 Blanford Signal numbers corrected    
26 Sep 2012 N519 Muswellbrook Points 86 corrected
26 Sep 2012 N513 Singleton Down Dep signal numbers corrected    
17 Sep 2012 N589 Gunnedah Coal Removed Gunnedah Colliery Loader
17 Sep 2012 N567 Werris Creek Altered signal WC (15) 37    
17 Sep 2012 N566 Werris Creek Altered signal WC (15) 32
15-Sep-12 N557/8 Kankool / Willow Tree Signal changes to 10-11M&L, 11-12M&L    
12 Sep 2012 N534 Port Waratah Xovers between departures roads changed
24 Aug 2012 N558 Chilcotts Creek New Turnouts installed    
13 Aug 2012 N513 Singleton Outer Home signal 150.4 was missing
3 Aug 2012 N510 Lochinvar Closure of Station Lane RLX    
1 Aug 2012 N515 Newdell Junction New T/O on downn
1 Aug 2012 N513/4 Camberwell T/Os for new Up relief    
1 Aug 2012 N511/2 Branxton Commissioning of third track (Up relief)
29 Jul 2012 N510 Allendale New T/O for Up relief    
23 Jul 2012 N538 Koorangang island Development of #4 dump station
18 Jul 2012 N575 Bylong Extension of loop - new t/o installed    
13 Jul 2012 N554, 557 Pages River Commissioning of new loop
10 Jul 2012 N514 Glennies Creek MN4 missing    
27 Jun 2012 N532, 535 Bullock Island New sinage on arrival roads
8 Jun 2012 N557/8 Chilcotts Creek Page rearrangements for new loops under construction    
8 Jun 2012 N537 NCIG #2 unloader commissioned
4 Jun 2012 N588 Gunnedah 54 points number corrected    
4 Jun 2012 N591 Boggabri Frame numbers revised
4 Jun 2012 N597 Moree Silo Frame numbers revised    
29 May 2012 N504/505 Hexmam Commissioning of new Hexham Relief loop
11 May 2011 N507 Maitland New repeaters 211 & 213. Chanes to 201, 203    
11 May 2012 N526 Drayton New signs and signal changes
7 May 2012 N513/523 Campberwell Commissioned new Xover and Loop entry ref Numdah 3rd track project
7 May 2012 N581 Gulgong Removed frame D and Xover
7 May 2012 N538 Kooangang New turnouts in preparation fro unloader #4    
3 May 2012 N510/511 Greta Commissioning of new Greta TSF access
2 May 2012 N577 Pages Creek New TOs installed    
2 May 2012 N511 Branxton LX @ 218.02 removed and new TO installed towards 3rd track
16 Apr 2012 N511 Branxton Shortened siding    
16 Apr 2012 N578/581 Ulan-Gulgong Extended CTC to Gulgong
13 Apr 2012 N578 Ulan New Xstrata fuelling    
13 Apr 2012 N543 Bulga New Xstrata fuelling
13 Apr 2012 N524 Mt Owen New Xstrata fuelling    
9 Mar 2012 N554/7/8 Pages Creek Start construction Pages Creek Loop (N557 new sheet)
7 Mar 2012 N523 Camberwell Coal 3rd Track project    
7 Mar 2012 N514 Nundah 3rd Track project
7 Mar 2012 N513 Camberwell Jcn New drawing sheet    
7 Mar 2012 N506 Metford New trackside measuring equip    
7 Mar 2012 N504 Hexam New Signal Gantry    
24 Feb 2012 N588 Gunnedah Frame G and Xover removed
24 Feb 2012 N511 Branxton Main line poits for Greta TSF installed    
2 Feb 2012 N504 Hexam Points installed for new Hexam Refuge Loop
11 Jan 2012 various network Changes throughout to reflect lease change of CRN from ARTC to JHR (eff 16/1/12)
11 Jan 2012 N512 Belford RLX replaced by bridge    
28 Nov 2011 N592 Narrabri Coal Track and signage alterations
16 Nov 2011 N537 NCIG 2nd loader added    
6 Nov 2011 N560 Quipolly New drawing - Quipolly moved from N559
6 Nov 2011 N559 Bells Gate New Loop under construction    
2 Nov 2011 N454 Dubbo Reconfigured shunt signals 36 & 38
2 Nov 2011 N569/N585 Burilda Commissioned new loop    
 3 Sept 2011 N525 Hunter Valley Unloaders Added Telemetry channels
 3 Sept 2011 N524, 525 Mt Owen Added landmark    
 3 Sept 2011 N541-544 Mt Thorley Branch Corrected terminal names
 3 Sept 2011 N532, 537 Pt Waratah - Kooragang Minor changes to unpoader signalling    
31 Aug 2011 N517 Antiene Details of Coal Loop Branches changed
31 Aug 2011 N515 Newdell Junction Details of Coal Loop Branch changed    
31 Aug 2011 N515 Ashton Coal Details of Coal Loop added
31 Aug 2011 N514 Glennies Creek Details of Coal Loop Branch added    
31 Aug 2011 N514 Camberwell Jcn Details of Coal Loop Branch added
31 Aug 2011 N512 Whittingham Details of Mt Thorley Branch changed    
31 Aug 2011 N505 Thornton Details of Coal Loop Branch added
31 Aug 2011 N551 Dartbrook Coal Loop Added    
31 Aug 2011 N541-544 Mt Thorley Branch Coal Loops Added
31 Aug 2011 N521-527 Lower Hunter Coal Loops Added    
5 Aug 2011 N576 Coggan Creek Added active RLX 610
30 Jul 2011 N568-9 Werris Creek Repositioned signal 15-54    
29 Jul 2011 N571 Bengalla Loop Commissioned new loop
29 Jul 2011 N551 Koolbury Commissioned new loop    
29 Jul 2011 N519 Muswellbrook Signal changes at down end of yard
8 Jul 2011 N554 Murrurindi T/Os E & H removed    
23 Jun 2011 N515 Newdell Junction Added signal NJ24 and corrected NJ8
21 May 2011 N504 Hexham Commissioning XO 104    
17 May 2011 N537 Kooragang Island South 2nd loader development
7 May 2011 N572 Mangoola Loop Added missing signal MA11    
7 May 2011 N514 Singleton Added missing signal 148.7
28 Apr 2011 N577 Wilpinjong Commissioned new loop    
28 Apr 2011 N576 Coggan Creek New sheet (sheet expansion)
8 Mar 2011 N512 Greta-Minibah Signalling changes    
8 Mar 2011 N511 Greta-Minibah Signalling changes
8 Mar 2011 N510 Greta-Minibah Signalling changes    
3 Mar 2011 N535 Bullock Island Commissioned Crossover H
3 Mar 2011 N504 Hexham New X Over 104 - Not yet commissioned    
3 Mar 2011 N501 Islington Junction Corrected interface distance
23 Feb 2011 N572 Bengalla Preparations for new Bengalla Loop    
23 Feb 2011 N571 Bengalla Preparations for new Bengalla Loop
23 Feb 2011 N519 Muswellbrook Preparations for new Bengalla Loop    
15 Feb 2011 N551 Koolbury Construction of new loop
15 Feb 2011 N552 Aberdeen Split drawing    
17 Jan 2011 N533 Port Waratah Morandoo Sidings - ownership change to ARTC
11 Dec 2010 N581 Dunedoo Added Enginers siding    
11 Dec 2010 N517 Newdell Junction Modified signal numbers
11 Dec 2010 N515 Newdell Junction Modified signal numbers    
11 Dec 2010 N502 Waratah Sig C102.8 is suspended
10 Dec 2010 N567 Werris Creek Minor layout changes    
10 Dec 2010 N566 Werris Creek Minor layout changes
15 Nov 2010 Drawing numbers 508-513 altered Changes to allow for expansion with proposed development
       
11 Nov 2010 N572 Mangoola Coal New Coal loop commissioned    
11 Nov 2010 N538 Kooragang Island Fueling on #3 road
11 Nov 2010 Drawing numbers 551-581 altered Changes to allow for expansion with proposed development
       
2 Nov 2010 N532 Port Waratah complex Road designations added    
2 Nov 2010 N531 Port Waratah complex Road designations altered
2 Nov 2010 N555 Quirinda Points designation corrected    
2 Nov 2010 N554 Kankool Catch Point 53 added
2 Nov 2010 N553 Murrurundi Down sidings  o.o.s    
2 Nov 2010 N513 Muswellbrook Signal designations corrected
2 Nov 2010 N574 Coggan Creek Frame F not A    
2 Nov 2010 N572 Kerrabee Siding removed
2 Nov 2010 N571 Denman Siding removed    
29 Oct 2010 N552 Parkville Loop extension    
29 Oct 2010 N501-505 Islington -East  Maitland Signal & Point designations corrected
25 Oct 2010 N537 Kooragang Island Added Shunt limits    
15 Oct 2010 N537-538 Kooragang Island New Drawings
10 Oct 2010 N531-526 Port Waratah complex New Drawings    
10 Oct 2010 N501/2 Schockey St Jcn Added links
5 Oct 2010 N507 Maitland Corrected signal designations & moved HBD    
27 Sep 2010 N541 Mt Tornley Branch Sheet number change - was N531
14 Jul 2010 All drawings with an active RLX.  Major review of all active RLX and ID numbers. Changes as required. Listed below - 1 drawing with RLX added
14 Jul 2010 N558 Werris Creek Added missing RLX at Werris St    
18 Jun 2010 N555 Quilopyy New Active RLX @ 401 873
18 Jun 2010 N556 Werris Creek Added Sig WC34    
26 May 2010 N571 Yarrawa New loop under construction
18 May 2010 N509 Minimbah New Up Relief Line    
18 May 2010 N511 Newdell Junction Minor changes
18 May 2010 N554 Kankool New Active RLX  @ Glenyalla Rd    
18 May 2010 N559 Gap New Active RLX  @ Gap Rd
10 Apr 2010 N503 Hexam 'Distance number' added to controlled signals still displaying it    
10 Apr 2010 N504 Hexam 'Distance number' added to controlled signals still displaying it
10 Apr 2010 N506 High Street Signal numbers corrected    
10 Apr 2010 N511 Newdell Junbction 'Distance number' added to controlled signals still displaying it
10 Apr 2010 N512 Drayton Junction 'Distance number' added to controlled signals still displaying it    
10 Apr 2010 N513 Muswellbrook Corrected signal number MK171
10 Apr 2010 N531 Saxonvale Junction Corrected signal numbers    
10 Apr 2010 N556 Werris Creek Added note re 'WC' vs '15' prefixes to signal numbers
10 Apr 2010 N557 Werris Creek Added note re 'WC' vs '15' prefixes to signal numbers    
10 Apr 2010 N558 Werris Creek Added note re 'WC' vs '15' prefixes to signal numbers
10 Apr 2010 N559 Werris Creek Added note re 'WC' vs '15' prefixes to signal numbers    
26 Mar 2010 N574 Wollar New RLX @ 415.115
26 Mar 2010 N571 Denman New RLX @ 313.460 & 321.857    
6 Mar 2010 N552 Scone Frame B and siding removed
4 Mar 2010 N531 Whittingham Preparations for Minibah 3rd track    
4 Mar 2010 N508 Branxton Preparations for Minibah 3rd track
4 Mar 2010 N509 Minibah Preparations for Minibah 3rd track    
4 Mar 2010 N510 Whittingham Preparations for Minibah 3rd track
2 Mar 2010 N574 Wilpinjong New Ulan Road RLX    
21 Jan 2010 N508 Branxton Corrected RLX chainage
14 Dec 2009 N573 Murrumbo New Loop commissioned    
11 Dec 2009 N575 Ulan New Moolarbeen Coal Loop
29 Nov 2009 N572 Baerami New Loop commissioned    
18 Nov 2009 N554 Braefield New loop installed
16 Nov 2009 N552 Scone Remove Frame F    
18 Oct 2009 N554 Braefield Signal locations changed
7 Aug 2009 N513 Muswelbrook Major yard upgrade & signal renumbering
7 Aug 2009 N571 Bengalla Signal & point renumbering (part Muswellbrook yard)    
7 Aug 2009 N571 Yarrawa Proposed loop @ 317 renamed
7 Aug 2009 N573 Baerami New HS turnouts installed @ 342.3 & 344.2 (not commissioned)    
5 Aug 2009 N509 Minimbah New HS turnout installed @ 224.0 (not commissioned)